Section 94A Contributions Plan 2015

Section 94A of the Environmental Planning and Assessment Act 1979 authorises a Consent Authority to grant consent to a proposed development subject to a condition requiring the applicant pay a levy of the percentage of the proposed cost of carrying out the development.

Money required to be paid by a condition imposed under Section 94A is to be applied towards the provision, extension or augmentation of local infrastructure (or towards recouping the cost of their provision, extension or augmentation).

Council’s Section 94A Contributions Plan 2015 sets out the following:

  • Location maps of the local infrastructure items supported by a works schedule setting out an estimate of their cost and staging
  • The relationship between the expected development in Hawkesbury City and the local infrastructure included in this Plan
  • The section 94A levy rates for the anticipated types of development in the area
  • The administrative and accounting arrangements applying to contributions that are required by this Plan

The Section 94A Contributions Plan 2015 came into effect on 17 December 2015.

Section 94A Contributions Plan 2015 (4.5 MB)

Ministerial Direction - 10 November 2006 (Repealed) (47.4 KB)

Ministerial Direction - 14 September 2007 (Repealed) (19.6 KB)

Page ID: 34832